Allington Energy From Waste Facility:
Maidstone

Allington Waste to Energy PlantAllington Waste to Energy Plant (2)Vertically fitted Labyrinth ventilatorRoof mounted natural ventilationRoof mounted natural ventilation (2)

Project Details:

  • Location: Maidstone
  • Developer/Operator: Kent Enviropower
  • Main Contractor: Hochtief

Brief:

To supply and install a smoke control system with natural ventilation to the Energy to Waste power generation facility based in Maidstone.

Overview

Colt undertook the supply and installation of a smoke control solution to the Allington Energy to Waste plant located near Maidstone.

Colt installed Seefire, Labyrinth and Meteor natural ventilators as extraction points in the roof and walls of the building for the clearing smoke in the event of a fire at the plant. The natural ventilators provide both day to day and smoke ventilation as well as the entry of natural daylight thus enhancing the working conditions within the facility.

All of the ventilators are controlled using a Colt designed control panel and a pneumatic control system which automatically opens all of the ventilators in the event of a fire being detected.

Related Information

Colt y sector de generación de energía

Colt y la generación de energía

Descubra el innovador sistema de ventilación de Colt y las soluciones de control de humo...

Propuesta de Diseño de Colt

Propuesta de Diseño de Colt

Productos Colt para Centrales de Generación de Energía

Productos para Centrales de Generación de Energía

Colt ofrece una amplia gama de productos acorde con las grandes demanadas del sector de la generación de energía....